Tue 2 Nov 1830
From John R Denyer
To John Lane Esq
Oxford
Assure Committee every attention to economy where practicable.
Washhouse built at Wallbridge completed. Cellar was abandoned as Washhouse erected though the application may be renewed. The Land at Boxwell Springs remains as seen but desirable to ascertain what took place under the enclosure. The documents to be inspected by Mr Jones.
If possible, depths of water in wells to be measured every fortnight until the springs break.
Taking advantage of recent dry weather and reduced water in the earth to erect Crane at Cirencester. As no water can be taken from River Churn to supply summit level during the period of 6 or 7 days have ordered Engine to work day and night as only collateral branch being impeded. The main line remaining navigable.