Mon 4 Jun 1821
From John R Denyer
To J S Salt
London
A quantity of mud to get out of one of the ponds at Daneway was done last week. At the same time had the stop planks put down in various parts of the summit level. Several defects were discovered near the aqueduct at Coxes Valley – partial repairs were done making the canal passable again.
The Sinking Fund account was examined to be correct re the statement in the balance sheet.